PowerFlamer Propane 160 – Long Lead Time

$129.98$209.98

You can pre-order here (your money charged) to be placed into our waiting list.  Although ship time can range as long as 3~6 months, shipping sequence will be according to the sequence in this waiting list, first order first ship once products become available.  Placing pre-order here indicates that you accept this long lead time condition.  You can always contact us with questions.  
PowerFlamer Propane 160 burners, 0~160kBTU/Hr continuous heat.
Note: Non-zero number in stock below means that you can pre-order into our waiting list.  It does not mean that we have inventory to ship immediately after you place the pre-order here.  

Clear

Description

These stoves are the same as our regular PowerFlamer propane 160 except with long lead time from order to ship due to various factors such as capacity, inventory (in stock or not) etc..  If you can tolerate such long waiting time (3~6 months),  you can pre-order above into our waiting list.  

The stove in this product family is constructed to achieve best heating by concentrating flames toward the bottom of a wok.  High and adjustable power (heat) cooking is the key to retaining fresh and crispy of your food.

The stove comes with a high pressure regulator, hose, and a tank connector. If the stove is configurable, it can be configured to connect to a propane tank or bottle. If the stove is not configurable, it is ready to connect to a propane tank;

The short-legged stove can be used on a table at home backyard. The long-legged stove can be used as a ground stove, or on a table after detaching the long legs. If your cooking style involves wok tossing, you might want to consider purchasing long leg stabilizer adaptors.

The PF13xx160xx is equivalent to a commercial version for fast stir frying in restaurants.  It uses high pressure propane gas to achieve the most powerful outdoor stove ever built for wok cooking.  It does not work with the flat bottom cookware adapter FBCA_PF13x130.   New generation of PF13xx160xx stoves adds to stove stability, smooth burner and pilot flames, detachable hose/regulator assembly and  non flame blocking wok adapter while maintaining their simple, robust, sturdy and reliable operation with key features of stainless braided hose, spider web guard, integrated top burner plate, adjustable position for wok adapter, ACME type 1 QCC connector for north America and POL connector for rest of the world (PF13xx160xx);

Heat for all manual ignition stoves is continuously adjustable from 0 to 160kBTU/Hr;

Stove wind guard: 13″;  stove ring diameter: 13″;  Hose length: 5′;  Height of long-leg stoves: 30″ for PF13xxL160xx stoves; height of short-leg stoves: 12″; Leg base diameter: long-leg stoves: 30″, short-leg stoves: 10″.

For electronic ignition version, we can’t guarantee that the main burner can be reliably ignited by the electronic igniter head.  We recommend to have a manual BBQ long-arm igniter handy in case the electronic igniter head is not functioning.

(PF13L160, PF13S160, PF13L160EI, PF13S160EI, PF13CL160, PF13CS160, PF13CL160EI, PF13CS160EI)

Additional information

Weight 27 lbs
Dimensions 24 × 14 × 30 in
LongOrShortLegs

,

ManualOrElectronicIgnition

,

TankOrBottle

,

Documents

A video of PowerFlamer propane 160 made by customers Les and Ann.

How to get full pressure from regulator?  Time between two click sounds from regulator before it is ready to give high pressure can vary, up to 1 minute.

How to light pilot light for PF13x160 Manual stove?

PF13L160 flame.

Introducing PF13L160, a powerful outdoor stir fry stove.

PF13L160, a powerful outdoor stir fry stove.

Q&A

I would like to know what the difference is between PF13L160 and PF13CL160.

Inquiry:  I would love to hear when they are back in stock. Also I would like to know what the difference is between those two. Outdoorstirfry:  You are in the to-be-notified list now. About the difference between PF13L160 and PF13CL160, PF13L160 will only work with a 20lbs propane tank.  PF13CL160 can work with a 20lbs […]

Questions on PF13L160EI

Inquiry:  Hello, I’m looking to purchase, but have a few questions.     1) The PF13L160EI, is there any other difference between this and the manual ignition, besides the ignition? Has the electronic ignition gotten better? I read some of ur archived info, and it seems the electric ignition isn’t too reliable, and I think it’s […]

is 36cm good for PF13L160

Inquiry:  I see you include standard hookup for US 20lb propane tank. Does this hookup include the regulator? Will this unit cradle a 36cm round bottom wok?  What is the smallest wok I can use with this unit? Outdoorstirfry: The stove has a regulator and a connector for a 20lbs propane tank. 36cm is about […]

Wok burner (PF13L160) Not Hot Enough

Customer:  I noticed my burner is not turning up so high.  I have it on full blast and I can only get a medium flame.  I did leave it out overnight and there might be some rust accumulating, maybe the holes are a little plugged.  It used to run very hot at max output.  What […]

How long will the gas burner (PF13L160) last using the 1lb. propane bottle?

Inquiry:  Quick question, for the models that can handle both the 20lb propane tank and the 1lb. portables propane bottle. How long will the gas burner last using the 1lb. propane bottle? Outdoorstirfry:  Our experience is that a bottle is sufficient for one night camping cooking for a family of 4.  To be sure, we […]

Gas smell with PF13L160

Customer (PF13L160):  I have been noticing that there is a gas smell with my PF13L160 when I’m cooking for a longer time, around 10 minutes. However I don’t notice it if I’m cooking within 2-3 minutes. I’m a little concerned, is this normal? Outdoorstirfry:  Can you use soap water to test all joints from regulator […]


PF13S160 Height

Inquiry:  If I remove the legs to place on a table what is the height of just the burner unit? Outdoorstirfry:   It is about 7~8″.

PF13S160El hose change question

Customer (PF13S160EI/CarbonSteelWok/CastIronWok): I have the PF13S160EI can I change the hose from the red rubber hose to this: KIBOW 0~30PSI High Pressure Adjustable Propane Regulator w/8FT SS Braided Hose-Type1 (QCC1) and 3/8 Female Flare Swivel Fitting – with Gauge for Forge/Foundry https://www.amazon.com/dp/B07BK35Z3D/ref=cm_sw_r_cp_api_i_2vX4Bb5KQR8FA I like the look of it better for my outdoor kitchen and also I need a longer hose. […]

where to install the propane tank – PF13S160EI Outdoor kitchen installation?

Inquiry: Hello, I am wanting to install this into my outdoor kitchen. The counter top is made of concrete, I was just thinking of putting a hole through the countertop and installing a propane tank in the cabinet below the wok. Will that work or do I need to install the propane tank farther away from the wok? Thanks! […]

My PF13S160 wok burner was delivered to the UK within 7 days.

From T. M.: My PF13S160 wok burner was delivered to the UK within 7 days. I took it to Calor [bottled gas suppliers]. They confirmed the regulator would fit UK propane cylinders and supplied a 19kg cylinder [which will deliver maximum output]. I secured the bottle to a sack truck [as shown] so that the […]

Handle problem with PF13S160EI

Gia:  When I look back, in all fairness, I realize that the problem might not be caused by a defect of your product, but rather by my improper way of using it after a long winter. First, when I tried to light up the burner, I turned the regulator counter clock wise and put it […]

Pilot light

Customer (PF13S160):  I received the stove today. Thanks for shipping quickly. 1 question i have is regarding the pilot light. I’ve read many discussion regarding the pilot light on your website, but I’m still not clear. While I do agree the pilot flame works the best when it’s 1-inch in length, but in order to […]


I would like to know what the difference is between PF13L160 and PF13CL160.

Inquiry:  I would love to hear when they are back in stock. Also I would like to know what the difference is between those two. Outdoorstirfry:  You are in the to-be-notified list now. About the difference between PF13L160 and PF13CL160, PF13L160 will only work with a 20lbs propane tank.  PF13CL160 can work with a 20lbs […]

Inquiries for PF13CL160

Inquiry: Hello, I was interested in the PF13CL160/PF13L160 and had several questions that I hope you can answer.     – How long is the installation process?     – Do you have a video of how to put the burner together?     – How difficult is it to put together?     – CL version indicates it […]

Isn’t the PF13CL160 model compatible with a 20lb propane tank?

Customer (PF13CL160): I have been using the wok for a while now and I absolutely love it. It is just so powerful. I am very happy to have found your product and everyone I demonstrate the wok burner to is very impressed. One question that I have is, isn’t the PF13CL160 model compatible with a 20lb […]

PF13CL160EI

Inquiry: The item above is listed at 209. vs the PF13L160EI which I see no different at all but the price, second, can I order one with black in color as you stated in your website. Outdoorstirfry: PF13CL160EI has an adapter that can work with 1lb propane bottle that is convenient for people to camp.    If you […]

Unsure what type of burner to purchase.

Inquiry: Can you tell me what is the difference between the «EasyFlamer EF13CSP50WG» and the «EF13SP50WG» models? The specs on this page are the same. Outdoorstirfry:  EF13CSP50WG is capable of being powered by a 1lb propane bottle besides from a 20lbs propane tank. EF13SP50WG is only able to be powered from a 20lbs tank. Inquiry: Is […]

Questions from Australia

Inquiry: Hi,   I am interested in purchasing the PF13CL160EI or PF13CL130EI wok burner and have a few questions; 1) I live in Australia, by purchasing the configurable option will this be compatible with our local LPG bottles? 2) The height of the long-leg option is 35 inches (89 cm). This seems taller than the wok burners in […]

Thank you very much for shipping this so quickly!

Customer (PF13CL160): Thank you very much for shipping this so quickly! I really look forward to trying out this Wok burner. It was by far and away the best option that I found online. This was especially true for the price point. Everyone seems to have very good things to say about it. Outdoorstirfry: Thanks […]

Delivery cost

Inquiry: I am going to admit that it is difficult to find high power burners in the UK and I really like yours. I have few questions though as a complete newbie… I understand that you can fire the electronic ignition burner manually with a flame too, can you not? (just in case 🙂 ) I have […]

200 times?

Inquiry: Hello, I would like to get the Continuous to 160kBTU/Hr. 32 lbs because I am going to use it for commercial purpose in a street food market. Do you think this device can handle 200 – 300 preparation a day for 3 days in a row? and whats the difference with this one Continuous […]


Whether this model would stand up to all day use in a commercial setting?

Inquiry:  Hello, I am interested in purchasing one or more of your products and I am trying to learn little bit more details about them. Specifically the model EF05CSP10TRI and/or the PF13CS160EI. With the modelEF05CSP10TRI my main question is whether this model would stand up to all day use in a commercial setting? So in […]

How much for shipping to Puerto Rico?

Inquiry: How much for shipping to Puerto Rico? Outdoorstirfry: It would be US$xx. Inquiry: How long would it take to get here? Outdoorstirfry: Should be within 6~10 business days. Inquiry: Whats the diff between PF13S160 and PF13CS160? Outdoorstirfry: PF13S160 only works with a 20lbs propane tank. PF13CS160 work with both 20lbs propane tank and 1lb […]

The burner has been fantastic but today the burner lost high pressure.

Customer (PF13CS160EI): The burner has been fantastic but today the burner lost high pressure. The ignitor will still run high but the main burner is not able to to run high. Tried a new tank of gas and got the same results. Outdoorstirfry: You have a configurable stove.  Are you using 1lb propane bottle or […]

Specifications needed on model# PF13CS130

Inquiry: Hello, i need the specs on the above model number, etc. how many btu’s does this stove has and can it be used with a descada 22inch disc that’s used to stir fry. Does the 130 means that this stove has 130,000 btu’s used for cooking, you site will not let me add to […]

Hi or Low? Shipping to UK?

Inquiry: Hello guys,  I’ve been looking through your great web site as I’m looking for a single wok burner as they are few and far between here in the UK.   Ideally I would like like a burner that might connect to 13kg propane tank – the kind that you might connect to a BBQ (I can attach an European […]

will you be having a black Friday sale on your stoves?

Inquiry:  will you be having a black Friday sale on your stoves? Answer:  Thanks for the inquiry.   Due to tight inventory, we will only put on sale on PF13L160, PF13S160, PF13CL160 and PF13CS160 stoves, about half of their regular price, for only one day.   Their description is here.

Questions on PF13L160EI

Inquiry:  Hello, I’m looking to purchase, but have a few questions.     1) The PF13L160EI, is there any other difference between this and the manual ignition, besides the ignition? Has the electronic ignition gotten better? I read some of ur archived info, and it seems the electric ignition isn’t too reliable, and I think it’s […]

can this burner PF13L160EI go on pilot? how does the electric ignition work?

Inquiry: can this burner PF13L160EI go on pilot? how does the electric ignition work? Outdoorstirfry: The left knob controlling electronic ignition can be turned counter clockwise. Along the way toward its 90 degrees, you will hear hissing sound of the gas going out of the copper ignition pipe. About 90 degrees you will hear a click. […]

Questions Comparing PF13L160 and PF13L160EI

Inquiry: Hello, I am deciding to get the 13″ PF13L160 (manual) or the PF13L160EI (electronic ignition). I have some questions about the two. 1.) The “manual” version is a new generation with improvements in hose, regulator, spider guard and burner plate. I like that. How come the “EI” version does not have these improvement? 2.) You mentioned on […]

If i order a PF13L160EI, can it be configured with metal hose?

Customer: I have been a long time user of your stove. I am about to order a new one to replace the one i have been using for 10 years. How come the picture in the Home page uses a metal braided hose while the product comes with a rubber hose which is subject to […]

I bought the PF13L160EI product 5 years ago. The burner stopped working today.

(Customer PF13L!60EI): I bought the PF13L160EI product 5 years ago.  The burner stopped working today.  I don’t hear any gas coming out of the burner (no hissing sound like before).  I confirmed that the gas tank is full.  Is there a way for me to figure out what’s happening, or ship repair materials?   Thanks! Outdoorstirfry: […]

I purchased the PF13L160EI and I love it.

Name: Bart Boos, Alberta, Canada (PF13L160EI + CastIronWSL) Feedback:   I purchased the PF13L160EI and I love it. I use it regularly and have served many great meals to my family and friends as a result. I have a blog that see a fair bit of traffic and have featured your product in it and […]


where to install the propane tank – PF13S160EI Outdoor kitchen installation?

Inquiry: Hello, I am wanting to install this into my outdoor kitchen. The counter top is made of concrete, I was just thinking of putting a hole through the countertop and installing a propane tank in the cabinet below the wok. Will that work or do I need to install the propane tank farther away from the wok? Thanks! […]

Handle problem with PF13S160EI

Gia:  When I look back, in all fairness, I realize that the problem might not be caused by a defect of your product, but rather by my improper way of using it after a long winter. First, when I tried to light up the burner, I turned the regulator counter clock wise and put it […]

Oil spill

Customer (PF13S160EI):  Hello!  I hope you are well. I have a question for you if you have time.  I was deep-frying fish last night and had an oil spill onto the burner of my stove, now half of the ring does not burn.  Will this fix itself over time?  Should I unscrew the top plate […]

PF13S160El hose change question

Customer (PF13S160EI/CarbonSteelWok/CastIronWok): I have the PF13S160EI can I change the hose from the red rubber hose to this: KIBOW 0~30PSI High Pressure Adjustable Propane Regulator w/8FT SS Braided Hose-Type1 (QCC1) and 3/8 Female Flare Swivel Fitting – with Gauge for Forge/Foundry https://www.amazon.com/dp/B07BK35Z3D/ref=cm_sw_r_cp_api_i_2vX4Bb5KQR8FA I like the look of it better for my outdoor kitchen and also I need a longer hose. […]

I’ve received the stove. Didn’t take long in the mail.

Name: Andrew, Australia, Product (PF13S160EI) Feedback: I’ve received the stove. Didn’t take long in the mail. Just replying for your information. I did a test trail without doing a cook up. Yep it’s what I wanted. HIGH POWERED. Our Answer (if any):


PF13CL160EI

Inquiry: The item above is listed at 209. vs the PF13L160EI which I see no different at all but the price, second, can I order one with black in color as you stated in your website. Outdoorstirfry: PF13CL160EI has an adapter that can work with 1lb propane bottle that is convenient for people to camp.    If you […]

Questions from Australia

Inquiry: Hi,   I am interested in purchasing the PF13CL160EI or PF13CL130EI wok burner and have a few questions; 1) I live in Australia, by purchasing the configurable option will this be compatible with our local LPG bottles? 2) The height of the long-leg option is 35 inches (89 cm). This seems taller than the wok burners in […]

Delivery cost

Inquiry: I am going to admit that it is difficult to find high power burners in the UK and I really like yours. I have few questions though as a complete newbie… I understand that you can fire the electronic ignition burner manually with a flame too, can you not? (just in case 🙂 ) I have […]

Replacement part for the ignition knob

(R. Seaby, PF13CL160EI, MD): My burner arrived and is working perfectly!  Made Kung Pao Chicken for dinner, YUMM!  FYI, The silly plastic knob arrived cracked.  Are they available as a replacement part?  Perhaps they should be shipped separately instead of installed on the gas control shaft?  The plastic is pretty thin. (Outdoorstirfry):  We usually ship the […]

Love my new stove!!!

(R Seaby, Maryland, PF13CL160EI) Love my new stove!!! Great value for the $$$


Whether this model would stand up to all day use in a commercial setting?

Inquiry:  Hello, I am interested in purchasing one or more of your products and I am trying to learn little bit more details about them. Specifically the model EF05CSP10TRI and/or the PF13CS160EI. With the modelEF05CSP10TRI my main question is whether this model would stand up to all day use in a commercial setting? So in […]

The burner has been fantastic but today the burner lost high pressure.

Customer (PF13CS160EI): The burner has been fantastic but today the burner lost high pressure. The ignitor will still run high but the main burner is not able to to run high. Tried a new tank of gas and got the same results. Outdoorstirfry: You have a configurable stove.  Are you using 1lb propane bottle or […]

Hi or Low? Shipping to UK?

Inquiry: Hello guys,  I’ve been looking through your great web site as I’m looking for a single wok burner as they are few and far between here in the UK.   Ideally I would like like a burner that might connect to 13kg propane tank – the kind that you might connect to a BBQ (I can attach an European […]


Do you have additional pictures for the 130? And does this ship to Canada?

Inquiry:  Do you have additional pictures for the 130? And does this ship to Canada? Outdoorstirfry:  What picture of PF13x130 do you want to see?  The burner of a PF13x130 is about 4″ in diameter.   We do ship to Canada. Inquiry:  Is there any duties or anything with it coming to Canada?    Also how […]

I’m just curious.

Customer (PF13S160):   Thanks for the tracking #. Probably like many others, I purchased this stove after Kenji’s review. I hope you guys have a boom in business!    Looking up the history of your company, it’s very impressive. Can you educate me on which products are the ones you have full design control over? and […]

Will you have any more of these in the future?

Inquiry: Will you have any more of these in the future – PF13L160? Outdoorstirfry: PF13x160 and PF13x160EI series products new version will be available in June of 2019.   In the mean time we have a few refurbished PF13L160 available for immediate shipment.   For refurbished one please see here.

Questions Comparing PF13L160 and PF13L160EI

Inquiry: Hello, I am deciding to get the 13″ PF13L160 (manual) or the PF13L160EI (electronic ignition). I have some questions about the two. 1.) The “manual” version is a new generation with improvements in hose, regulator, spider guard and burner plate. I like that. How come the “EI” version does not have these improvement? 2.) You mentioned on […]

If i order a PF13L160EI, can it be configured with metal hose?

Customer: I have been a long time user of your stove. I am about to order a new one to replace the one i have been using for 10 years. How come the picture in the Home page uses a metal braided hose while the product comes with a rubber hose which is subject to […]


Pilot Light (PF13xx160) dies out

Customer: Minor  issue  with pilot light. When  I  turn on normally  it will fire up and die out. I have to remember  to turn it on very  slightly and it will  stay lit. I guess  when it’s on too much it will light and die out. Outdoorstirfry: Thanks for the video showing what you mean […]

I’m just curious.

Customer (PF13S160):   Thanks for the tracking #. Probably like many others, I purchased this stove after Kenji’s review. I hope you guys have a boom in business!    Looking up the history of your company, it’s very impressive. Can you educate me on which products are the ones you have full design control over? and […]

Do I need this Easy Tank Connector also when I purchase a stove?

Inquiry: I want to buy one of your stoves. I plan to connect a 20 lb. propane tank to the stove. Do I need this connector also? Please explain what the part does. Outdoorstirfry: This is a very good question.   Regulators for PF13xx160EI, PF13xx130EI, EF13xP50xx (propane EasyFlamer) series stoves sometimes do not work well with […]

If i order a PF13L160EI, can it be configured with metal hose?

Customer: I have been a long time user of your stove. I am about to order a new one to replace the one i have been using for 10 years. How come the picture in the Home page uses a metal braided hose while the product comes with a rubber hose which is subject to […]

Size question: 9″ or 13″

Inquiry: Hi,  I’m trying to figure out which burner I should get. If I want to cook with a 14″ wok, should I get the PF13 or the PF9 burner? If I want to cook with a 16″ wok, should I get the PF13 or the PF9 burner? I have a family of 5 people […]

Do manual lighting models have a pilot?

Inquiry: Do manual lighting models have a pilot? Outdoorstirfry: Only our manual PF13xx160 stoves have pilot.   One of our customer had concern before purchase about needing to let the pilot on during cooking wasting energy.   The pilot has its own valve and can be shut off (not used).

12″ & 18″ wok

Inquiry: Which of you LP burners will work with 12″ & 18″ wok. Not sure if a 9″ will work for both sizes. Thank you. Outdoorstirfry: For your 12″ wok, all stoves except PF13xx130 series can work.   Even PF13xx130EI, PF13xx160 and PF13xx160EI can work with 12″ wok. For your 18″ wok, you are right, our […]

need high btu

Inquiry: Does the PF13L160 does it come with wind guard, the picture shows no wind guard for this model? can it be used with a standard grill home type propane? will this 13″ burner fit a 14″ and 18″ wok? Outdoorstirfry: 1.        The outer body of this stove PF13L160 is the wind guard plus support […]