PowerFlamer Natural Gas 160 Fixed Installation and 120 Quick Connector – Long Lead Time

Price range: $249.98 through $379.98

Please Note that these stoves use natural gas as fuel.   They do not work with propane gas.

You can pre-order here (your money charged) to be placed into our waiting list.  Although lead time (pre-order to ship) can range as long as 1~2 week, shipping will be according to the sequence in this waiting list, first pre-order first ship once products become available.  Placing pre-order here indicates that you accept this long lead time condition.  You can always contact us with questions.

Please note – FixedInstalltion option: 0-160kBTU/Hr.  Quick Connector option: 0-120 kBTU/Hr.

Long valve handle is incorporated in this new generation products for easier flame control.  Read more here.

Description

These stove products have long lead time from pre-order to ship due to various factors such as manufacturing capacity, inventory (in stock or not) etc..  If you can tolerate such long waiting time,  you can pre-order into our waiting list. 

PowerFlamer Natural Gas 160 Burners: the burner is cast iron. This burner is designed for fixed installation purpose.  Our PowerFlamer Natural Gas 160 fixed installation burners can be adjusted from 0 to 160kBTU/Hr.   The PowerFlamer Natural Gas 160 burners do not go with any hose, the connector from the burner is 5/8″ OD (15/16-16 thread) flare. This is a connector of typical dimension to connect to a natural gas pipe line using a stainless fixed installation hose. The stainless hose is not included in the stove package. It is commonly available from local hardware stores. Depends on actual installation site situation, additional installation hardware may be needed as well. There are a couple pictures of a usage example with a stainless gas line fixed hose (yellow) in the Usage Examples section.

PowerFlamer Natural Gas 120 Burners with Quick Connector: the burner is cast iron. This burner is designed for purpose of quick connect – plug and cook.  Our PowerFlamer Natural Gas 120 with quick connector burners can be adjusted from 0 to 120kBTU/Hr continuously.  The PowerFlamer Natural Gas 120 burners go with a 5 feet flexible hose.  The hose ends are equipped with a 3/8″ female flare connector and a male quick disconnector.   A matching female quick connector socket will be also sent with the package to be installed onto a natural gas pipe end.  A quick connector set has a plug (male) and a socket (female).  The plug is installed onto the hose while the socket will need to be installed to the natural gas pipe.

Each of these burners has a pilot light. You can use a long nose BBQ ignitor to light up the main burner and then use the main burner to light the pilot.  The pilot can stay for your entire cooking process.  The pilot flame is optimal at length of 1 inch.  The wind guard has been upgraded to cast iron with durable paint.   On top of the wind guard is a wok adapter. This flexible wok adapter allows the cook to adjust to his cooking position. The heat from these stoves are equivalent to restaurant type stove power. In order to achieve highest possible heat from natural gas, we use jet type burner which does not always maintain blue flame, especially at low flame level.  Videos on the flame pattern and how to get out of yellow flame can be found in the document section.

If your cooking style involves wok tossing, you might want to consider purchasing long leg stabilizers.  Description and usage examples of the long leg stabilizers are at the product page of  stabilizers.   Stove cover is at stove cover.  The short leg stoves are compatible with the stove stand.

Long leg version dimension is 24x13x37 inches.  Short leg version dimension 24x13x14 inches.  Distance between short legs is 13 inches.

(PF13LFN160, PF13SFN160, PF13LFN160_Cover, PF13LFN160_Stabilizers, PF13LFN160_Stabilizers_Cover, PF13SFN160_Cover, PF13LQN120, PF13SQN120, PF13LQN120_Cover, PF13LQN120_Stabilizers, PF13LQN120_Stabilizers_Cover, PF13SQN120_Cover)

Additional information

Weight 29 lbs
Dimensions 24 × 13 × 32 in
QckCntrOrFxdInstl

,

LongOrShortLegs

,

Stabilizers

Add Stabilizers, No Stabilizers

Stove Cover

Add stove cover, No stove cover

Documents

PF13xQN120 Natural Gas 120 Burner with Quick Connector flame pattern is similar to a PF13LQN160 PowerFlamer Natural Gas Fixed Installation Stove Flame, with different max heat rating.

How to move away from yellow flame?

Usage Examples

Here are a couple pictures of utilizing a yellow stainless flexible hose, readily available in local hardware store, to connect a PowerFlamer Natural Gas 160 Fixed Installation burner to a natural gas pipe.

Yellow Stainless Flexible Hose Pipe EndYellow Stainless Flexible Hose Burner End

PF13SFN160_Stand
PowerFlamer natural gas 160 short leg in a stand.
PF13SQN120_Stand
PowerFlamer natural gas 120 short leg in a stand

Here are a few pictures of the stove (earlier version) from customers.

Here are a couple pictures of customer pot sticking with a skillet.

PF13SFN160 PF13SFN160

Q&A

Rust by Rain?

Rust on the stove body does not affect the stove functionality. Please try to keep the burner top plate holes out of any water and snow.

-40C?

Plastic and Rubber parts are most vulnerable in the entire stove to withstand -40C environment.