PowerFlamer Propane 160 – Long Lead Time

Price range: $149.98 through $389.98

You can pre-order here (your money charged) to be placed into our waiting list.  Although lead time (pre-order to ship) time can range as long as 1~2 week, shipping will be according to the sequence in this waiting list, first pre-order first ship once products become available.  Placing pre-order here indicates that you accept this long lead time condition.  You can always contact us with questions.  
PowerFlamer Propane 160 burners, 0~160kBTU/Hr continuous heat.

Our latest generation products have changed the valve inlet to slightly downward.

Description

These stoves have long lead time from order to ship due to various factors such as manufacturing capacity, inventory (in stock or not) etc..  If you can tolerate such long waiting time,  you can pre-order above into our waiting list.  

The stove in this product family is constructed with our optimized 5B burner to achieve best heating by concentrating flames toward the bottom of a wok.  High and adjustable power (heat) cooking is the key to retaining fresh and crispy of your food.

The stove comes with a high pressure regulator, hose, and a tank connector. If the stove is configurable, it can be configured to connect to a propane tank or bottle. If the stove is not configurable, it is ready to connect to a propane tank;

The short leg stove can be used on a table at home backyard. The long leg stove can be used as a ground stove, or on a table after detaching the long legs. If your cooking style involves wok tossing, you might want to consider purchasing long leg stabilizer option.

The PF13xx160xx is equivalent to a commercial version for fast stir frying in restaurants.  It uses high pressure propane gas to achieve the most powerful outdoor stove ever built for wok cooking.  It does not work with the flat bottom cookware adapter FBCA_PF13x130.   New generation of PF13xx160xx stoves adds to stove stability, smooth burner and pilot flames, detachable hose/regulator assembly and  non flame blocking wok adapter while maintaining their simple, robust, sturdy and reliable operation with key features of stainless braided hose, spider web guard, integrated top burner plate, adjustable position for wok adapter, ACME type 1 QCC connector for north America and rest of the world (PF13xx160xx).

The wind guard and wok adaptor ring are combined into one.  It no longer gives unlimited positions for wok long handle.  Instead, it provides flexibility for 3 wok long handle positions.

Heat for all PowerFlamer propane 160 stoves is continuously adjustable from 0 to 160kBTU/Hr.;

Stove wind guard: 13″;  Hose length: 5′;  Height of long-leg stoves: 30″ for PF13xxL160xx stoves; height of short-leg stoves: 8″; Leg base diameter: long-leg stoves: 30″, short-leg stoves: 10″.

For electronic ignition version, we can’t guarantee that the main burner can be reliably ignited by the electronic igniter head.  We recommend to have a manual BBQ long-arm igniter handy in case the electronic igniter head is not functioning.

For detail description and usage examples of the long leg stabilizers, please go its product page stabilizers.  The stove cover product page is at Stove cover.

Foot pedal is only available to manual ignition and tank only option stoves.  Please choose manual ignition and tank options before the foot pedal option becomes available.  Please expect lead time from order to ship a bit longer than normal as it involves more time to build.

The short leg version of this stove is compatible with the PowerFlamer cart and the stainless stand.

(PF13L160, PF13S160, PF13L160EI, PF13S160EI, PF13CL160, PF13CS160, PF13CL160EI, PF13CS160EI, PF13L160_Cover, PF13L160_Stabilizers, PF13L160_Stabilizers_Cover, PF13S160_Cover, PF13L160EI_Cover, PF13L160EI_Stabilizers, PF13L160EI_Stabilizers_Cover, PF13S160EI_Cover, PF13CL160_Cover, PF13CL160_Stabilizers, PF13CL160_Stabilizers_Cover, PF13CS160_Cover, PF13CL160EI_Cover, PF13CL160EI_Stabilizers, PF13CL160EI_Stabilizers_Cover, PF13CS160EI_Cover, PF13S160FT, PF13S160FT_Cover, PF13L160FT, PF13L160FT_Cover, PF13L160FT_Stabilizers, PF13L160FT_Stabilizers_Cover)

Additional information

Weight 27 lbs
Dimensions 24 × 14 × 30 in
LongOrShortLegs

,

ManualOrElectronicIgnition

,

TankOrBottle

,

Stabilizers

Add Stabilizers, No Stabilizers

Stove Cover

Add stove cover, No stove cover

FootPedal

Add_FootPedal, No_FootPedal

Documents

A video of PowerFlamer propane 160 made by customers Les and Ann.

How to get full pressure from regulator?  Time between two click sounds from regulator before it is ready to give high pressure can vary, up to 1 minute.

How to light pilot light for PF13x160 Manual stove?

PF13L160 flame.

Introducing PF13L160, a powerful outdoor stir fry stove.

PF13L160, a powerful outdoor stir fry stove.

Q&A

Stand and Cart compatibility

PowerFlamer propane 160/plus and natural gas 160/120 short leg stoves are compatible with our stand and cart.

Wok Size?

Explain a safe area to operate a wok handle.

Rust by Rain?

Rust on the stove body does not affect the stove functionality. Please try to keep the burner top plate holes out of any water and snow.










Usage Examples

Example 2 of PowerFlamer Cart Usage
Example 2 of PowerFlamer Cart Usage
Stand with Wheels
Stand with Wheels

Below are couple photos from a customer in Mexico.

PF13S160_Mexico1_SmallPF13S160_Mexico2_Small